Last updated 4/4/25
Key facts
Address: Kimmeridge Wellsite, Kimmeridge, Dorset
Planning applications: Multiple applications between the late 1970s and 2023
Operator: Perenco
Licence: PL89
Status: Oil producing field. Controversial for history of venting and current flaring.
Key facts
Address: Kimmeridge Well site, access road to Gaulter, Kimmeridge
Planning applications:
Operator: Perenco
Licence:
Status: Oil-producing site on the Jurassic Coast cliffs. Controversial venting of methane and volatile organic compounds into the atmosphere.

Timeline
25 March 2025
Production from the Kimmeridge oil site up 6% in 2024. Details
April/May 2024
In April 2024 and May 2024, three oil sites (Horndean, Kimmeridge and Beckingham) accounted for more than half the volume of gas vented onshore . April 2024 data May 2024 data
10 November 2023
Venting data revised down at Kimmeridge oil site. Details
1 November 2023
NSTA data shows flaring at Kimmeridge has been carried out between November 2022 and August 2023 (the most recent month for which data is available)
31 January 2023
Date by which flaring should end at Kimmeridge well site (but see above)
28 November 2022
Kimmeridge largest UK onshore oil sites for methane venting. Details
27 September 2022
Perenco withdraws planning application for a temporary flare. Details
26 September 2022
Kimmeridge oil site burns gas because of equipment delays. Details
19 July 2022
Perenco applies for permission to install a temporary flare to burn waste gas at Kimmeridge. It says the flare will be used for six months. Dorset Council says it will monitor the site and decide whether the flare is needed. Details
23 May 2022
Angus Energy announces oil production resumes. Detail
14 January 2022
Kimmeridge oil site continues to vent hundreds of tonnes of methane. Details
23 October 2021
Investigation reveals “significant” methane emissions at Kimmeridge onshore oil site. Details
26 August 2021
Kimmeridge operator, Perenco, loses more than £101m – company accounts. Details
5 October 2020
Dorset Council approves application for installation of plant, including a gas compression unit, to facilitate a reduction in the venting of methane and volatile organic compounds. Details
6 September 2013
Dorset County Council approves extension of planning permission at Wytch Farm, Wareham and Kimmeridge until 2037.
September 2012
Perenco applies to Dorset County Council for permission to extend the life of 39 planning permissions for Wytch Farm, as well as Wareham and Kimmeridge.
17 May 2011
BP announces the sale of its majority interest in Wytch Farm, Wareham, Beacon and Kimmeridge fields to Perenco, which becomes the new operator.
11 April 2001
Dorset Council approves application for erection of plant and equipment for five years for the recovery of gas and generation of electricity. Details
19 July 2017
Operational life of the oilfield extended from 11 November 2016 to 31 December 2037.
31 May 1977
First planning application for Kimmeridge oil field. Details
1961
Oil production begins
March 1959
Oil discovered at Kimmeridge